Permeable Block Paved Driveway, Poole
Cracked concrete replaced with a fully permeable block paved drive, rebuilt from the sub-base up.
6 days
Read the full storyOur work
Real jobs, with the problems we ran into written down honestly rather than tidied away. Drag the sliders to see the difference.
Placeholder gallery. These six case studies are written as examples so the layout and structure can be judged. As Dad's before-and-after photos and notes come through, each one gets replaced with the real thing – same template, real content.
Cracked concrete replaced with a fully permeable block paved drive, rebuilt from the sub-base up.
6 days
Read the full story28sqm rear extension to a 1930s semi, with reclaimed brickwork matched to the original.
12 weeks on site
Read the full storyCement pointing removed by hand and replaced with a matched lime mortar on a Victorian terrace.
5 weeks including scaffold
Read the full storyA failing 2.1m retaining wall taken down and rebuilt properly, with the drainage that was missing first time.
4 weeks
Read the full storyRear extension, full-width dormer and a complete internal refit to a dated 1960s bungalow.
22 weeks
Read the full storyA failed cement-pointed wall rebuilt in knapped flint with brick lacing courses and lime mortar.
7 weeks
Read the full storyFree, no-obligation quote
Tell us what you have in mind and we will come and look at it. Free written quote, no obligation.